Suwannee Water Treatment Plant CEI*

Suwannee County, Florida

A wastewater treatment plant calls for modernization

Menadier Engineering’s Principal Engineer provided administrative oversight for inspection services on the Suwannee Water Treatment Plant. This project included resident inspection for the construction of two (2) 8-inch diameter wells with 350gpm pumping capacities, 120k gallon storage tank, an automated chlorination system, electrical equipment building, two (2) 750gpm high service pumps with one (1) 350gpm back-up high service pump, and two (2) 5,000 gallon hydropneumatics tanks. Documentation included daily inspection reports, pictures, material quantity tracking, administering change order requests, payment application reviews, and coordination with the County, Engineer of Record and funding source. This project was funded by FDEP State Revolving Fund.